We are currently experiencing a polyurethane foam shortage due to the temporary shutdown of the companies that produce the chemicals needed to manufacture all foam components and cushioning.  This issue was created due to the extreme cold weather and power outages that occurred in Texas, where the majority of these chemicals are sourced.  We will continue to produce orders each week, but this reduction from our suppliers will occur for the next four to six weeks.  At the moment, our average lead time is 20 weeks, but quite possibly could expand to 22 weeks before this issue is rectified. If you do not see a published date, please email or call customer service for an update.

1817-01S

Malibu Swivel Chair

Overall h36.5 d39 w30.5
Inside d22 w21.5 ah23 sh20.5

Edge stitching/Loose back cushion/Swivel/Waterfall skirt/ No bullion available on skirt without custom alteration.

Also Available:
1817-00 Ottoman h18 d22.5 w27.5

For the upholstered base version: Please see the 3517-01S Redding
 

Related Furniture