We are currently experiencing a polyurethane foam shortage due to the temporary shutdown of the companies that produce the chemicals needed to manufacture all foam components and cushioning.  This issue was created due to the extreme cold weather and power outages that occurred in Texas, where the majority of these chemicals are sourced.  We will continue to produce orders each week, but this reduction from our suppliers will occur for the next four to six weeks.  At the moment, our average lead time is 20 weeks, but quite possibly could expand to 22 weeks before this issue is rectified. If you do not see a published date, please email or call customer service for an update.

1019-03N L

Gemma Sofa-Nickel

Overall h36 d36 w91.5
Inside d22.5 w83.5 ah24.5 sh22.5

(2)19"Throw Pillows/Edge stitching /Loose back cushions/Nickel metal legs
No nails available

Also Available:
1019-02N Nickel Loveseat
1019-01N Nickel Chair w33.5
1019-03C Carbon Sofa
1019-02C Carbon Loveseat
1019-01C Carbon Chair
1019-03A Aged Brass Sofa
1019-02A Aged Brass Loveseat
1019-01A Aged Brass Chair


Available in leather. No nails available.

L Available in Leather

Related Furniture