We are currently experiencing a polyurethane foam shortage due to the temporary shutdown of the companies that produce the chemicals needed to manufacture all foam components and cushioning.  This issue was created due to the extreme cold weather and power outages that occurred in Texas, where the majority of these chemicals are sourced.  We will continue to produce orders each week, but this reduction from our suppliers will occur for the next four to six weeks.  At the moment, our average lead time is 20 weeks, but quite possibly could expand to 22 weeks before this issue is rectified. If you do not see a published date, please email or call customer service for an update.

362-01

Monterey chair

Overall: h41.5 d41.5 w36
Inside: d18 w23 ah23.5 sh21

(1) 11.5” x 20.5” Kidney pillow / Loose back cushion /Waterfall skirt on sides and back / 11 1/8” Dressmaker skirt on front / No bullion available on skirt without custom alteration

Options Shown: Contrasting fabric on back cushion. Contrasting fabric/trim on kidney pillow.

Also Available: 362-00 Ottoman h18 d27 w33.5 - 10” Skirt

 

Related Furniture